A blog about quilting and using the LEFT-EZE Rule - my HST/QST Ruler designed for LEFT-HANDED Quilters -
Pages
▼
Thursday, January 18, 2018
Prep work -
Like having the binding ready to go -
May not save me any time later -
Since it has to be done eventually -
Sew me now or sew me later - LOL -
But it makes my life easier if I have it "prepped" beforehand - ;))
Like "Dug" - the dog in the movie "UP" - I often get distracted by "Squirrels" -
But before I chased my latest "Squirrel" - I made sure I finished the binding prep work. I made another set of green/gold binding for my O Happy Christmas and finished up the pink/white binding - and then found that I didn't like how the pink polka dots were showing on the little flange -
So I "un-sewed" it and substituted a solid white - saving the white with pink polka dots for something else - someday - ;))
Then I did some prep work on my "Squirrel" -
And that's as far as I got today -
Stay tuned -
Tomorrow is a PLAY day!! - ;))
Talk to you later - gotta go - gotta sew -
Great thing to do. I did that one time and forgot I had it...made another binding and later found the old one...go figure...maybe I need to write myself a note??
ReplyDeleteHurry up with that squirrel, you are teasing us too much. ;)
ReplyDeleteSomehow those widely placed polka dots are not as easy to control as smaller ones.
ReplyDelete