A blog about quilting and using the LEFT-EZE Rule - my HST/QST Ruler designed for LEFT-HANDED Quilters -
Pages
- Home
- LEFT-EZE™ Rule
- LEFT-EZE™ Rule - Tutorials
- LEFT-EZE™ Rule - Size Chart
- LEFT-EZE™ Rule - Free Pattern & Tutorial
- LEFT-EZE™ Rule - Reviews/Testimonials
- About This Blog - And Me
- Rules
- Reviews
- Quilt Journal
- QJ - Floral Applique
- Sudoku Quilts
- Studio Organization
- Fabric Storage Tips
- Left-Handed Quilting (LHQ) - Introduction
- LHQ - Basics
- LHQ - Rotary Cutting
- LHQ - Construction
- LHQ - Hand Sewing
- LHQ - Binding
- LHQ - Finishing The Quilt
- LHQSQ - LHQ Sampler Quilt
- UFOs/Projects/Squirrels
- Quilt-Along - LHQSQ 2.0
- Privacy Policy
Saturday, March 7, 2020
More slowly -
She pokes along - LOL -
But my Imperial Bargello should pick up speed soon - ;))
I got the first two "four-sies" sewn into an "eight-sie" -
And the next four strips are ready to go -
It should go faster now -
Since the strips are getting wider -
And it's easier to "un-sew" them -
Because it's all "downhill" from here -
Literally -
The design flows "downhill" the rest of the way -
You'll see - LOL - ;))
Talk to you later - gotta go - gotta sew -
Subscribe to:
Post Comments (Atom)
3 comments:
This is really coming along, unsewing and sewing, and going downhill is great!
I know how nice it is to see the twosies become foursies and the foursies become eightsies.
You are getting there.
You're making great progress. It's going to be a stunner!
Post a Comment