A blog about quilting and using the LEFT-EZE Rule - my HST/QST Ruler designed for LEFT-HANDED Quilters -
Pages
- Home
- LEFT-EZE™ Rule
- LEFT-EZE™ Rule - Tutorials
- LEFT-EZE™ Rule - Size Chart
- LEFT-EZE™ Rule - Free Pattern & Tutorial
- LEFT-EZE™ Rule - Reviews/Testimonials
- About This Blog - And Me
- Rules
- Reviews
- Quilt Journal
- QJ - Floral Applique
- Sudoku Quilts
- Studio Organization
- Fabric Storage Tips
- Left-Handed Quilting (LHQ) - Introduction
- LHQ - Basics
- LHQ - Rotary Cutting
- LHQ - Construction
- LHQ - Hand Sewing
- LHQ - Binding
- LHQ - Finishing The Quilt
- LHQSQ - LHQ Sampler Quilt
- UFOs/Projects/Squirrels
- Quilt-Along - LHQSQ 2.0
- Privacy Policy
Sunday, June 10, 2018
One more Heart done -
For the muslin doll - ;))
I put the Heart and the Scrap Card in a "sheet protector" for the time being -
That will keep all of the "pieces" and notes together until I get the Scrapbook page done - ;))
Then I finished some more "chores -
There never seems to be an end to those things -
They seem to multiply faster than my Scraps do - LOL - ;))
Talk to you later - gotta go - gotta sew -
Subscribe to:
Post Comments (Atom)
2 comments:
Testing - ;))
What a cute heart.
My chores multiply as fast as my UFOs!!!
Post a Comment