The backing for my Upstairs/Downstairs - Marigold -
Has been pressed -
The zippers have been sewn on -
And it's loaded on the frame -
But that's as far as I got - ;))
Talk to you later - gotta go - gotta sew -
A blog about quilting and using the LEFT-EZE Rule - my HST/QST Ruler designed for LEFT-HANDED Quilters -
1 comment:
Hopefully today you can get the batting and backing on the frame and get started with the quilting.
Post a Comment